Laying pipe on the seafloor can pose a number of challenges, especially if the water is deep. There are three main ways that subsea pipe is laid -- S-lay, J-lay and tow-in -- and the pipelay vessel is ...
In summer 2002, three pipelines were installed by the pull method to Forest Oil Corp.'s Redoubt Shoal field Osprey platform, Cook Inlet, Alas., in a project that used new technology in several areas.
Addressing offshore construction challenges requires a multidisciplinary approach, combining pipeline engineering, ...
Pipelay in the deepwater Zohr natural gas field reached 8.6 km/day for 8-in. OD pipeline and 4 km/day for 30-in. OD heavy WT sour service pipeline using S-lay. J-lay of 14-in. OD clad pipelines peaked ...
The team at W.A. Rasic Construction completed a major pipeline installation project in Picacho Peak, Arizona, further demonstrating their ability to deliver complex infrastructure in challenging field ...